Watch high-definition, the best quality! April 20, 2010 and 21 JF White contract and Saugus Construction Company has completed two huge lifts one leg to support in Massachusetts, Chelsea, Chelsea Street Bridge, North Tower, the main structure. Each pre-assembled, the first weighing 424,000 pounds (212 tons) and height of 120 feet. Complete the top of the structure height of 220 meters. Processing costs by using the Demag CC2800 Hallm ore grid-Superlift configuration 600 tons crane, along with the 600-ton Demag crane off by the column. Erection of steel structure construction with the local crew assistance ironwork in Boston, Massachusetts Saugus. Brokenkites soundtrack director, shooting and Stephen SetteDucati www.setteducati.com, edit